home

Design, Development,...

Design, Development, Supply, Integration, Implementation and Maintenance of Customized ERP Solution for Bangladesh Ordnance Factories for (BOF)

Project Details

  • Client
  • Category
    Government
  • Start Date
    08 Feb, 2021
  • End Date
  • Project Value
    505342.29 USD
  • Founded by
    Government

Design, Development, Supply, Integration, Implementation and Maintenance of Customized ERP Solution for Bangladesh Ordnance Factories for (BOF)

This includes developing, installing, and commissioning 28 ERP modules as specified in the technical specifications, with each module also featuring a mobile app version compatible with both Android and iOS platforms.

a) Preparation of detailed implementation plan covering the complete life-cycle of the project.

b) Complete project management activities as per standard norms & practices.

c) Deployment of resources on-site at the project location(s).

d) Supply, install, configure, customize and implement offered ERP software as per requirements.

e) Provisioning of servers & associated hardware/software of suitable configuration required for training, development & configuration, quality testing for use during implementation till BOF infrastructure is available for utilization.

f) Assist BOF in validating the delivery and installation of the hardware as per requirement.

g) Design of improved, streamlined, standardized, more efficient to-be processes through business process reengineering based on industry best practices, ERP supported process improvements and BOF requirements.

h) Development of forms, reports, interfaces, custom components and enhancements to meet business requirements.

i) Testing (unit testing, integration testing, user acceptance testing, load testing, stress testing and stabilization testing).

j) Preparation of templates for data collection, verification & migration. Provide required training and support to BOF in the data collection & verification process. Complete responsibility for data migration.

k) Functional overview training, detailed functional training, technical training and end-user training. Supplier shall arrange the training.

l) Required project activities during the transition period such as completion of user manuals, system manuals, business continuity & disaster recovery manuals, master & transaction data migration, end-user training, help-desk setup. Post go-live support for ERP product, functional & technical support for implemented solution & related services.

Scope of work/feature/list of modules

  • Recruitment, 2. Record (HRM) Staff & Workman
  • Record (HRM) Officers 4.Access Control
  • Clearance 6.Visitor Management System
  • Budget & Cash 8.Finance
  • Transportation Management
  • Ration and Welfare Management
  • Estate Management
  • Planning & Progress (P & P)
  • Material Control (MC)
  • Purchase (Local & Foreign)
  • Store & Inventory
  • Inspectorate of Armaments and Exclusives (IA&E)
  • Inward Store Inspection (ISI)
  • Central Tools Manufacturing (CTM)
  • Quality Control Lab (QCL)
  • Small Arms (SA)
  • Small Arms Ammunition (SAA)
  • High Caliber Ammunition and Grenade (HAG)
  • Maintenance
  • Employee Health Management
  • Research & Development (R&D)
  • Drawing Management
  • Military Engineering Service (MES)
  • Finance Control